39th Air Base Wing conducts Titan Ready exercise

Staff Sgt. Dimitri Pfeifer (left), a contracting supervisor assigned to the 39th Contracting Squadron, and 1st Lt. Grace Bowen, 39th Civil Engineer Squadron engineering flight commander, assemble tents during a readiness exercise at Incirlik Air Base, Turkey, April 8, 2022. During the exercise, first-response organizations tested their capabilities, provided hands-on training, and evaluated safety procedures to optimize overall readiness in the event of a real-world incident. The 39th ABW stands ready to project global power through strategic deterrence, agile combat support, and enduring partnerships to defend U.S. interests and its allies along NATO’s southern flank. (U.S. Air Force photo by Staff Sgt. Jacob Derry)

PHOTO BY: Staff Sgt. Jacob Derry
VIRIN: 220408-F-YG657-1122.JPG
FULL SIZE: 3.81 MB
Additional Details

CAMERA

NIKON D810

LENS

70.0-200.0 mm f/2.8

APERTURE

32/10

SHUTTERSPEED

1/100

ISO

800

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.